Dear SPOCs
Following patches were deployed on 05.09.2018 McCamish
With regards
FSI-PLI TEAM
Centre for Excellence inwards Postal Technology
Following patches were deployed on 05.09.2018 McCamish
16814 | Bulk upload should non hold out allowed , if full payment inwards feed file exceeds the sum inwards suspense for that group. |
16928 | If the transaction is made alongside an sum that is to a greater extent than than the premium, it needs to hold out adjusted for subsequent month. (Validation inwards to_Date inwards collection option) |
16938 | Change to adapt premium sum paid during the initial collection. Total Amount collected should hold out adjusted according to planned premium + GST as well as PTD should hold out accordingly |
16931 | Calculation logic for Yugal Suraksha product Minimum(21 years) as well as maximum(45 years) age for main as well as secondary insurants |
16932 | Date of proposal should reverberate every bit appointment of get-go of adventure inwards Duplicate premium receipt generated. |
With regards
FSI-PLI TEAM
Centre for Excellence inwards Postal Technology
Tag :
Mccamish
0 Komentar untuk "Mccamish Update : Novel Patches Deployed Inwards Production On 05.09.2018"